We ran a $2.25m Parnell villa through Jeli last week. Here's the entire analysis — no sign-up, no paywall, no skipped sections. Have a poke around.
A 14m² deck was added in 2019 with a building consent — but the council file shows no Code Compliance Certificate (CCC). Without that sign-off, your insurer may decline a claim on the deck itself, and a future buyer can use it to negotiate.
The west boundary clips a regional flood map. This won't stop a sale, but your lender will likely want a fresh insurance quote before they confirm the loan.
The driveway is shared with the cross-lease neighbour at 14A. The easement isn't spelled out on the title. Worth asking your conveyancer to clarify before you make an offer.
Modern monolithic with cavity, post-2005.
Long-run colour-steel, replaced 2021.
R3.6 ceiling, R2.6 underfloor — full Healthy Homes compliance.
2018 rewire on RCDs. All sign-offs on file.
Mains pressure, copper to coloured PEX after 2015.
Single House Zone. No designations or notices.
No noise / boundary complaints on council record.
First two reports are on us. No card, no subscription. About 90 seconds turnaround.